LOCATION

Charlotte, NC

 

SIZE

8.2 MW 175,000 sq. ft. Data Center Facility

 

SCOPE

  • BAS Control Retrofit and Multi-Phase Expansion Construction of a 175,000 sqft Data Center
    • Consisting of redundant control
  • 12 – 300 ton Chiller Lineups
  • 1 – Added New Data Hall #3
  • 2 – Thermal Storage Tanks
  • 1 – Thermal Storage Tank (New)
  • 5 – 2.5 MW Generators

FEATURES

  • Looped Primary only chilled water plant
  • Non-Dedicated Chilled Water Pumps
  • Generator Fuel System Monitoring, Control, and Fuel Polishing
  • Generator Room, UPS Room, and Battery Room Monitoring and Control
  • Data Hall CRAH Fan Speed Control and Communications
  • Hydrogen Monitoring and Alarm System
  • Energy Monitoring System
  • Redundant Data Floor and Administration Air handling Units
  • 38 VAV and Fan Powered Boxes and 12 Fan Coil Units
  • Building Utility and Administrative AHUs
  • Building Utility Room CRAHs