LOCATION

Toronto, Canada

SIZE

166,000 sq. ft. Data Center

SCOPE

  • 2 – 3,300 Ton Heat Exchangers
  • 3 Data Floors Total Buildout
  • 7 – 2.5 MW Generators (5 future)

FEATURES

  • Looped Primary Only Chilled Water Plant
  • 2 – 540 Ton Redundant Smart Chillers
  • 2 Cooling Towers with VFDs
  • Non-dedicated Chilled Water Pumps, Condenser Water Pumps and Cooling Towers
  • Cooling Tower Water Level Control (Radar Level)
  • Generator Fuel System Monitoring
  • Generator Room, UPS Room and Battery Room Monitoring and Control
  • Energy Monitoring System
  • Redundant Data Floor and Administration Air Handling Units
  • 8 COLO AHU Units (7,500 cfm each) (66 COLO AHUs Total Buildout)
  • 38 VAV Boxes, Fan Powered Boxes and 8 Fan Coil Units
  • 2 Primary Pumps VFD Phase 1
  • 7 Primary Pumps VFD Total Buildout
  • 2 Condenser Pumps VFD Phase 1
  • 7 Condenser Pumps VFD Total Buildout