LOCATION
Charlotte, NC
SIZE
8.2 MW 175,000 sq. ft. Data Center Facility
SCOPE
- BAS Control Retrofit and Multi-Phase Expansion Construction of a 175,000 sqft Data Center
- Consisting of redundant control
- 12 – 300 ton Chiller Lineups
- 1 – Added New Data Hall #3
- 2 – Thermal Storage Tanks
- 1 – Thermal Storage Tank (New)
- 5 – 2.5 MW Generators
FEATURES
- Looped Primary only chilled water plant
- Non-Dedicated Chilled Water Pumps
- Generator Fuel System Monitoring, Control, and Fuel Polishing
- Generator Room, UPS Room, and Battery Room Monitoring and Control
- Data Hall CRAH Fan Speed Control and Communications
- Hydrogen Monitoring and Alarm System
- Energy Monitoring System
- Redundant Data Floor and Administration Air handling Units
- 38 VAV and Fan Powered Boxes and 12 Fan Coil Units
- Building Utility and Administrative AHUs
- Building Utility Room CRAHs