LOCATION
Denver, CO
SIZE
117,000 sq. ft. Data Center
SCOPE
- BAS System Complete Replacement
- 3 – Daikin Air Cooled Chillers (Existing)
- 1 – Daikin Air Cooled Chillers (New)
- 2 – Evapco Fluid Cooler (Existing)
- 1 – Evapco Fluid Cooler (New)
- 10 – Added New CRAHs to Utility Rooms
- 16 – Added New CRAHs to Data Hall #5
- Added TST Storage Capacity
- Added New Data Hall #5
- Replace Valves and Instruments not Functional
FEATURES
- Installed New BAS Controls Throughout Building Without Interruption
- Looped Primary only Chilled Water Plant
- 3 – 300 Ton Chillers
- 1 – 300 Ton Chiller
- 4 – Redundant Dedicated Chilled Water Pump Monitoring and Control
- Generator Fuel System Monitoring
- Generator Exhaust Damper Control
- Generator Room, UPS Room, and Battery Room Monitoring
- Battery Hydrogen Monitoring, Alarming, and Control
- Energy Monitoring System
- Redundant Data Floor Air Handling Units
- VAVs, Fan Powered Boxes, and Fan Coil Units
- Server Rack Temperature Monitoring System