LOCATION
Pittsburgh, PA
SIZE
32,400 sq. ft. Data Center
SCOPE
- Greenfield Construction of an Energy & Utility Plant serving a local Hospital.
- 3 – 2,750 ton chiller lines
- 3 – 50,000pph Boilers
- 4 – 2.5 MW Generators (1 future)
FEATURES
- Looped Primary only chilled water plant
- 35,000 linear feet of underground piping
- N+1 design for each system
- 3 Cooling Towers with VFDs
- Non-dedicated chilled water pumps, condenser water pumps and cooling towers
- Non-dedicated surge tank and deaerator feed water pumps
- Cooling Tower water level control (Radar Level)
- Generator & Boiler fuel system monitoring
- Energy monitoring system
- 3 Primary Pumps VFD Phase 1
- 3 Condenser Pumps VFD Phase 1